The Engine is IN!
Installed the restored brake distribution block and installed all new front brake lines from the master cylinder to the wheels.
Got the flywheel resurfaced at a machine shop on 14th street in Plano. Ben and I got the engine off the stand and onto the crane then got it mounted in the engine bay. No issues at all and we were able to bolt the motor mounts in just a few minutes. The Engine is IN!